摘要
The upper-middle of the Yongding River alluvial-proluvial fan meets the basic requirements to establish a groundwater reservoir. Based on the investigating thoroughly of the artificial recharge methods of the Yongding River groundwater reservoir,this paper further analyzes the infiltration ability of all recharge methods,proposes the corresponding artificial recharge engineer scheme. The result demonstrated that the maximum of recharge ability is 18.93 m3/s and the maximum of groundwater level rise is 32 m,the groundwater storage is recovered about 2.09×108 m3 when the total artificial recharge quantity was 2.42×108m3.The effective water storage rate was respectively about 78.6% and 46.8% after 1 and 5 years. It indicated that the groundwater reservoir have preferable adjustment effect, recharge ability and storage capacity.