The formation characteristics of Longdong coalfield region are described, and based on the analysis on the main factors influencing the drilling construction, the drill bit diameter increasing, the borehole structure optimizing, the suitable drill bit for rock optimally selecting, mud system improving and other supporting technologies were adopted. The paper focuses on the prevention and treatment of the adhesive sticking drill accident.
© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号 地址:北京市海淀区学院路29号 邮编:100083 电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700 |