摘要
Ada reservoir,one of the large reservoirs in the first phase of west route of South-to-North Water Transfer Project,located in the upper reaches of the Yalong River Gorge area,is the starting point of a diversion tunnel.After the impoundment of the reservoir,a series of environmental engineering geological problems may occur.Based on geological background of the reservoir,preliminary analysis of the potential environmental geological problems is made.