用户名: 密码: 验证码:
Practice of Diamond Wire-Line Coring Drilling in Broken Formation of Dawanggou Molybdenum Mining Area in Song County
详细信息   
摘要
According to the difficulties of wire-line coring drilling in complex formation of Dawanggou molybdenum mine with intense alteration,uneven hardness and gushing leakage,the wall protection was adopted by casing first and slurry secondly.The discussion was made on the selection of drilling equipments and tools as well as diamond bit parameters determination;wall protection with K + humate-containing drilling mud and plugging with inert stuffing were put forward and tripping pressure surge and suction damage to the hole wall decreasing measures were used with good application effects.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700