///Hydration swelling in coal measure strata with subsidence pool forming was the main difficulty in drilling construction in Yanjiang mine of Changbai;and hole collapsing,block-falling and deep limestone alteration formed karst cave with serious leakage and long construction period.Field analysis was made to solve the above problems by specific technologies.