There is 250 000 m3 weak expansive soil within the first and second contract sections of the Hefei-Lu’an Expressway project, which is poor in nature, cannot be directly used for filling of roadbed before lime treatment of it. The improved soil totaling 220 000 m3 has been used in the project, saving 3 million yuan investment. This paper introduced quality control of the process in which weak expansive soil is treated with lime.