用户名: 密码: 验证码:
An Analysis of Construction Conditions of Hutuo River Groundwater Reservoir
详细信息   
摘要
In this paper, the construction conditions of the Hutuo River groundwater reservoir are analyzed. The conclusions can be drawn. The boundaries of Hutuo river groundwater reservoir are nearly closed, and the storage capacity is as high as 10.04×108 m3. The Hutuo River bed can be used as natural groundwater reservoir leakage field. Based on forecast results, under different guarantee rate in 2020 and 2030, surplus water can be used for storage and regulation of the groundwater reservoir, and the regulating water quality has little effect on groundwater quality.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700