用户名: 密码: 验证码:

Discussion on the Reconnaissance Method of High Slope of Jing-Cheng Third-Phased Expressway

详细信息   
摘要
As a typical mountain expressway, Jing-Cheng expressway (from Shayugou of Miyun to Beijing municipal boundary) is located in hilly area caused by tectonic denudation. Subjected to unique terrain restrictions, subgrade engineering digs deeply and fills high. And the expressway has lots of bridges and tunnels. So the problem of excavation slope stability is more pronounced. By using dynamic survey instruments, such as engineering geological mapping, exploration and field test survey instruments, RMR in rock mass classification and red even shoots the projection extremely, this paper evaluates the stability of the side slope and gives rationalization proposals of road construction and slope reinforcement program.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700