用户名: 密码: 验证码:
Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions
详细信息    查看全文
文摘

New stochastic simultaneous optimization of extraction sequence and mining equipment.

SIP integrates uncertainties in metal/grade & fleet availability, hauling time etc.

Approach leads to lower cost and minable patterns.

Method leads to efficient fleet allocation, higher & less variable utilization.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700