用户名: 密码: 验证码:
Status of series production and test of the HTS current leads for Wendelstein 7-X
详细信息    查看全文
文摘
The Karlsruhe Institute of Technology (KIT) is responsible for design, production and test of the High Temperature Superconductor (HTS) current leads for the stellarator Wendelstein 7-X (W7-X). In total 14 current leads with a maximum current of 18.2 kA are required. Special feature is the upside-down orientation of the current leads because of the location of the power supplies in the basement of the experimental area of W7-X. One further important requirement is the Paschen tight electrical insulation of current leads and the connection to the bus bar system. Due to some very specific manufacturing steps, budget and time restrictions, it has been mutually decided between the project partners to manufacture most of the components in house, except the HTS stacks which have been produced and delivered by industry. As the semi-finished parts were manufactured in the central workshop of KIT, the assembly of the current leads was performed in the ITEP (Institute for Technical Physics). The final acceptance test of the current leads is performed at KIT, using a dedicated test cryostat assembled beside and connected to the main vacuum vessel of the TOSKA facility. The paper describes the status of the manufacturing of the current leads. In addition attention is given to specific problems that occurred during the manufacturing and testing.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700