用户名: 密码: 验证码:
A new method for calculating energy release rate in tunnel excavation subjected to high in situ stress
详细信息    查看全文
文摘
Based on energy theory, energy release rate (EER) and local energy release rate (LEER), a new index called FERR (Fractional Energy Release Rate) is proposed, and this method can not only evaluate the risk of rock burst, but also can point out the location of high risk and the scale of rockburst. The FERR index is applied to the TBM assembling tunnel in Jinping Hydro Power Station II to evaluate the scale and intensity of rockburst, as well as the location where rockburst occurs. With FDM method adopted, the energy release rate of 3 excavation plans are calculated and the scale and risk of rockburst is evaluated, and the location of high risk of rockburst is also mapped. With FERR used in the evaluation, the rockburst is nicely controlled which ensured the safety and construction schedule of the project.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700