用户名: 密码: 验证码:
DP150/50型节段拼装架桥机的设计及应用研究
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Design on DP150/50 Segment-assembled Bridge Erector and Its Application Research
  • 作者:贾力锋
  • 英文作者:Jia Lifeng;Zhengzhou New Dafang Heavy Industry Science & Technology Co.Ltd.;
  • 关键词:大纵坡 ; 大跨度 ; 整孔节段梁 ; 墩中心站立 ; 循环站位 ; 无支架
  • 英文关键词:large longitudinal slope;;large span;;full span segmental girder;;support on the pier center;;cyclic positioning exchange;;no pier bracket
  • 中文刊名:TDJS
  • 英文刊名:Railway Construction Technology
  • 机构:郑州新大方重工科技有限公司;
  • 出版日期:2019-02-20
  • 出版单位:铁道建筑技术
  • 年:2019
  • 期:No.307
  • 基金:郑州市技术研究与开发经费支持项目(131PZDZX007)
  • 语种:中文;
  • 页:TDJS201902008
  • 页数:5
  • CN:02
  • ISSN:11-3368/TU
  • 分类号:36-39+56
摘要
随着中国近海经济地区及中国桥梁建设技术的快速发展,跨江跨海大桥建设日益增多,比起陆地桥梁建设,海上施工有诸多不便,盐雾腐蚀、台风季的狂风暴雨、浪高汹涌等自然因素造成施工条件特别恶劣,设置通航孔也造成桥跨纵坡加大,且一般跨海桥跨度都比较大,大跨度桥能减少墩柱数量,节约建设成本。本次近海桥根据喂梁方式不同,采用先简支后连续设计,且桥墩为单墩独柱,根据桥梁设计要求,架桥机前主支腿需要站立在桥墩中心,不能设立墩旁支架,架桥机要具备自助架设墩顶预制节段的功能,针对此种实际工程的要求,我们研制出DP150/50型节段拼装架桥机,两主支腿采用循环站位,设备在舟山市岱山县鱼山大桥节段梁架设施工中成功应用。该架桥机的成功应用为今后类似节段拼装架桥机及节段桥设计提供坚实的理论依据及实践经验。
        Along with the rapid develop of offshore area and bridge construction technology in China,more and more bridges are built across over rivers and ocean.Compared with those on the land,bridges in ocean areas are more inconvenient to build due to the bad conditions formed by natural elements such as the corrosive salt fog,stormy weather and sea waves during typhoon season.And the requirements for ship routes also make the longitudinal slope of the bridge much larger.The spans of the bridge over the sea are normally very large,and the larger span results in less piers and lower construction cost.In this case,because the methods on feeding girder are different,the design about continuous bridge erected as simple-supported beam in advance is adopted and the piers are single pier with single pile.According to the design requirements,the front main leg of the launcher need to be set on the center of the pier,with no pier bracket,the bridging machine should have the function of launching the segment right above the piers.To solve the actual problems,we designed the DP150/50 segmentassembled bridge erector with cyclic positioning exchange of the two main legs.The application of the launcher for Yushan Bridge of Daishan County in Zhoushan was a big success,and it could provide a solid theoretical accordance and practical experience for the design of similar equipment and segment-assembled bridge erector in the future.
引文
[1]袁靖乙.大跨度连续梁及节段拼装梁施工机械配套技术[J].国防交通工程与技术,2017(S1):4-5,16.
    [2]王亮,周恒,张强.HZP1600节段拼装架桥机简介及施工研究[J].铁道标准设计,2012(10):50-53.
    [3]张志华,熊春奎.采用DP450型架桥机施工上海浏河大桥42 m预制节段箱梁[J].铁道标准设计,2002(2):4-6,10.
    [4]宋飞,代宇,贾力锋.DP500节段拼装架桥机主梁结构有限元分析[J].建筑机械,2016(9):49-52.
    [5]李英俊.上行式架桥机在节段梁施工技术中的应用探讨[J].山西建筑,2007(12):290-291.
    [6]余金江.48 m节段预制拼装箱梁架桥机弹性恢复的病害防治[J].铁道建筑技术,2017(5):49-52.
    [7]饶健辉.新型预制箱梁节段架桥机的研制及拼装质量控制技术[J].城市道桥与防洪,2009(5):117-120.
    [8]朱雄.节段拼装造桥机施工中的张拉卸载分析[J].国防交通工程与技术,2015(4):45-48.
    [9]邱广波.SX32/64型造桥机节段拼装铁路64 m双线简支箱梁综合施工技术[J].铁道标准设计,2010(3):71-74.
    [10]陈敦,成仲鹏.造桥机节段拼装64 m简支箱梁施工关键技术研究[J].筑路机械与施工机械化,2014,31(3):37-42.
    [11]张鸿,郑和晖,陈鸣.波形钢腹板组合箱梁桥节段预制拼装工艺试验[J].桥梁建设,2017(1):82-87.
    [12]李磊.TPZ80/2500型节段拼装造桥机的设计及在施工中的应用[J].国防交通工程与技术,2018,16(3):66-70,84.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700