多次采动影响下近距离回采巷道围岩控制技术
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Surrounding Rock Control Technology of Close Distance Mining Roadways Under the Influence of Multiple Mining Activites
  • 作者:谢小平 ; 苏静 ; 魏中举 ; 徐光
  • 英文作者:XIE Xiaoping;SU Jing;WEI Zhongju;XU Guang;College of Mining and Civil Engineering of Guizhou Liupanshui Normal College;School of Mines,China University of Mining & Technology;
  • 关键词:煤柱 ; 近距离巷道 ; 位移 ; 围岩控制 ; 矿压观测 ; 巷道支护
  • 英文关键词:coal pillar;;close distance roadways;;deformation;;surrounding rock control;;mine pressure observation;;roadway support
  • 中文刊名:MKAQ
  • 英文刊名:Safety in Coal Mines
  • 机构:贵州省六盘水师范学院矿业与土木工程学院;中国矿业大学矿业工程学院;
  • 出版日期:2019-03-20
  • 出版单位:煤矿安全
  • 年:2019
  • 期:v.50;No.537
  • 基金:六盘水师范学院科学研究资助项目(LPSSY201601)
  • 语种:中文;
  • 页:MKAQ201903020
  • 页数:5
  • CN:03
  • ISSN:21-1232/TD
  • 分类号:87-90+94
摘要
针对河北省崔家寨煤矿近距离煤层多次采动影响下回采巷道变形破坏严重的问题,采用理论分析和数值模拟相结合的方法,分析了采动影响下近距离回采巷道合理位置。根据崔家寨煤矿E12503工作面现场实际条件,确定了采用锚网索联合支护技术,并数值模拟确定了回采巷道与上部煤层遗留煤柱的相对水平距离应大于25 m、工作面护巷煤柱宽度为20 m。通过现场矿压观测,E12503回风巷道1#测站巷道左帮多点位移计数值达到最后稳定时最大位移值为22mm、巷道右帮最大位移为8 mm、顶板最大位移为5 mm。分析可知,优化设计的巷道围岩控制技术方案应用效果较好。
        For the problems of serious deformation and failure of the roadway under the influence of multiple mining activites in the close distance coal seams in Cuijiazhai Coal Mine in Hebei Province, we analyzed the reasonable position of the close distance mining roadways under the influence of mining by the theoretical analysis and the numerical simulation. According to the actual site conditions of E12503 working face of Cuijiazhai Coal Mine, we determined the combined support technology of anchor-net-rope, and determined that the relative horizontal distance between the mining roadway and the upper coal seam residual pillar should be greater than 25 m, and the width of the roadway pillar in the working face should be 20 m by the numerical simulation.It can be seen that the optimized design scheme has better application effect from the mine pressure observation, the maximum displacement value of the left side of the E12503 roadway 1#station is 22 mm and the maximum displacement of the right side of the roadway is 8 mm and the maximum displacement of the roof is 5 mm after the influence of the multiple mining activites.
引文
[1]林衍,谭学术,胡耀华.对缓倾近距离煤层群同采合理错距的探讨[J].贵州工学院学报,1994,23(2):33.
    [2]武忠,李日官.近距离煤层回采巷道布置研究[J].煤矿开采,2002(4):14-15.
    [3]林崇德,陆士良,史元伟.煤巷软弱顶板锚杆支护作用的研究[J].煤炭学报,2000,25(5):482-485.
    [4]唐永志,葛沐曦,黄开忠.近距离煤层联合开采技术与实践[J].煤矿开采,2002(Z2):6-8.
    [5]缪协兴,钱鸣高.采场围岩整体结构与砌体梁力学模型[J].矿山压力与顶板管理,1995(3):3-12.
    [6]陈炎光,钱鸣高.中国煤矿采场围岩控制[M].徐州:中国矿业大学出版社,1994.
    [7]吕志强,刘建军,郭敏江.近距离煤层群开采下巷道稳定性研究[J].煤炭科技,2009(1):11-14.
    [8]方新秋,郭敏江,吕志强.近距离煤层群回采巷道失稳机制及其防治[J].岩石力学与工程学报,2009,28(10):2059-2067.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700