核电厂改造的人因工程任务支持验证方法研究
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Research on Task Support Verification Method of Human Factor Engineering Applied to Nuclear Power Plant Reconstruction Project
  • 作者:王秋雨 ; 宋霏 ; 蒲晓彬 ; 罗敬平
  • 英文作者:WANG Qiuyu;SONG Fei;PU Xiaobin;LUO Jingping;Shanghai Nuclear Engineering Research & Design Institute Co.,Ltd.;CNNP Nuclear Power Operations Management Co.,Ltd.;
  • 关键词:核电厂 ; 人因工程 ; 人机接口 ; 验证和确认 ; 设计验证 ; 任务支持验证
  • 英文关键词:Nuclear power plant;;Human factors engineering(HFE);;Human system interface(HSI);;Verification and validation(V&V);;Design verification;;Task support verification(TSV)
  • 中文刊名:ZDYB
  • 英文刊名:Process Automation Instrumentation
  • 机构:上海核工程研究设计院有限公司;中核核电运行管理有限公司;
  • 出版日期:2019-06-20
  • 出版单位:自动化仪表
  • 年:2019
  • 期:v.40;No.454
  • 语种:中文;
  • 页:ZDYB201906020
  • 页数:6
  • CN:06
  • ISSN:31-1501/TH
  • 分类号:93-98
摘要
人因工程(HFE)任务支持验证(TSV)关注支持任务需求所需的物项可用性,即确保人机接口(HSI)设计能够提供人员执行任务必需的报警、信息、控制和任务支持。目前,公开标准和文献中提到的TSV方法更多地被应用于新建电厂项目。其关注点与电厂改造项目有一定差异,不能完全适用于电厂改造项目。对电厂改造与新建电厂TSV的差异进行了分析,并基于此提出了适用于电厂改造的TSV总体框架、实施方法和过程。它是一种以改造变更项为核心,围绕变更项对人机交互的影响进行分析和验证的方法。这一方法被应用于秦山核电厂控制室整体改造项目,并取得了良好的效果,证明了其对于电厂改造项目的有效性。
        Human factors engineering(HFE) task support verification(TSV) addresses the availability of items needed to support task requirements in order to ensure that the human system interface(HSI) provides the needed alarms,information,controls,and task support for personnel to perform their tasks.Currently,most of the TSV methods mentioned in public standards and literatures are applied to new built plant,whose focus point differs in some way from plant reconstruction projects.These differences between TSV of plant reconstruction and new built plant projects are analyzed.Based on it,the framework,implementation method and process of TSV which applies to plant reconstruction are proposed.It is a method of analyzing and verifying the impact of changes on human system interaction.This method has been used in Qinshan NPP control room reconstruction project and has acquired a good effect,which verified effectiveness of this method.
引文
[1] U.S.NRC.Human factors engineering program review model:NUREG 0711-2012[S].2012.
    [2] HUGO J V,SLAY III,et al.Human factors and modeling methods in the development of control room modernization concepts[C]//NPIC & HMIT 2017.San Francisco:American Nuclear Society,2017.
    [3] EPRI.Human factors guidance for control room and digital human- system interface design and modification:guidelines for planning,specification,design,licensing,implementation,training,operation,and maintenance for operating plants and new builds[R].EPRI 2015 Technical Report,3002004310.U.S.:EPRI,2015.
    [4] EPRI.Human factors guidance for control room and digital human- system interface design and modification:guidelines for planning,specification,design,licensing,implementation,training,operation,and maintenance[R].EPRI 2005 Technical Report,1010042.U.S.:EPRI,2005.
    [5] Fernandes,Strand,Braarud,et al.Modernization experiences in nuclear power plants’ control rooms[R].OECD Halden Reactor Project Report,HWR- 1126 (Rev.2).Norway:Itutt for Energiteknikk,2015.
    [6] EPRI.Task evaluations for nuclear plant I&C modernization strategies[R].EPRI 2005 Technical Report,1011934.U.S.:EPRI,2005.
    [7] U.S.NRC.Human- System Interface Design Review Guidelines NUREG 0700- 2002[S].2002.