摘要
针对某铁矿二期工程采矿范围内的水文地质条件和矿井充水因素及以往报告中该铁矿二期工程采矿范围内的矿坑涌水量预测值进行了分析,基于该矿一期工程帷幕注浆的堵水率和解析法分别预测了该铁矿二期工程实施帷幕注浆工程以后的矿坑涌水量。综合预测结果为:二期帷幕工程以后的正常矿坑涌水量为20093 m3/d,二期帷幕工程以后最大矿坑涌水量为31212.7 m3/d。根据预测结果和矿山实际情况,提出了一些建议。
This paper analyzes the hydro-geological conditions,water filling factors and the predicted mine water inflow values given in the past reports within the mining area in the second phase mining of some iron mine.Based on the water shutoff rate of curtain grouting in the first phase mining and analytic method,the mine water inflow in the second phase mining after implementing curtain grouting is predicted.The comprehensive prediction result is that the normal mine water inflow is 20093 m3/d,maximum mine water inflow is 31212.7 m3/d in the second phase mining of the iron mine after curtain grouting.Finally,according to the predicted results and actual conditions of the mine,some suggestions are put forward.
引文
[1]辛小毛,王亮.大水金属矿山防治水综合技术方法的研究[J].矿业研究与开发,2009,29(2):78-81.
[2]孙翠华,曾先贵.某铁矿井下近矿体帷幕注浆堵水及其效果评价[J].采矿技术,2011,11(4):95-96.
[3]魏克敏,赵茂森,王友长.宝鼎矿区深部水文地质条件研究及涌水量计算[J].中国煤炭地质,2010,23(1):29-35.
[4]崔杰.矿井涌水量计算方法评述[J].水力采煤与管道运输,2009(4):1-3.
[5]邱文才,刘旭文,钟志芳.中洞石灰岩矿区矿坑涌水量预测方法[J].西部探矿工程,2006(10):152-153.
[6]孙林华,桂和荣,陈松.皖北矿区深层地下水径流规律的地球化学反演[J].中国煤炭地质,2009,21(1):35-38.
[7]沈继芳,等.矿床水文地质学[M].北京:中国地质出版社,1992.
[8]薛禹群,朱学愚.地下水动力学[M].北京:地质出版社,1981.