用户名: 密码: 验证码:
植草沟专用堰的设计与率定研究
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:DESIGN AND ITS CALIBRATION OF SPECIAL TURTLES FOR GRASSING DITCH
  • 作者:冯玉启 ; 王文海 ; 李俊奇 ; 冯萃敏 ; 蔡志文 ; 郐彬
  • 英文作者:FENG Yu-qi;WANG Wen-hai;LI Jun-qi;FENG Cui-min;CAI Zhi-wen;GUI Bin;Key Laboratory of Urban Stormwater System and Water Environment,Ministry of Education,Beijing University of Civil Engineering and Architecture;Urban Planning & Design Institute of Shenzhen;
  • 关键词:植草沟 ; 流量计量 ; 三角堰
  • 英文关键词:grass-planting ditch;;measurement;;triangular weir
  • 中文刊名:HJGC
  • 英文刊名:Environmental Engineering
  • 机构:北京建筑大学城市雨水系统与水环境教育部重点实验室;深圳市城市规划设计研究院有限公司;
  • 出版日期:2019-07-15
  • 出版单位:环境工程
  • 年:2019
  • 期:v.37;No.253
  • 基金:北京市自然科学基金重点项目(8191001);; 北京未来城市设计高精尖创新中心项目资助(UDC2016040100)
  • 语种:中文;
  • 页:HJGC201907006
  • 页数:5
  • CN:07
  • ISSN:11-2097/X
  • 分类号:33-36+95
摘要
植草沟是海绵城市建设中一种重要的转输设施,但现有的计量方法难以直接测定植草沟流量,因而提出利用薄壁三角堰,并通过设计一种与植草沟贴合的堰槽方式来测定植草沟的过流流量,使用此设施不仅可以监测植草沟进出口流量,还可以在不破环植草沟结构的前提下测定植草沟内任意一段的流量。采用直线边坡加圆弧底方式构建了非常规堰槽结构、直角三角形开口方式,实验率定了堰上水头与流量之间的曲线,并与既有公式进行对比。结果表明:相同堰上水头条件下,直角三角堰用既有公式计算出的流量值小于该堰槽方式下的实测值,且相对差值较大,实验范围内最大差值达25. 9%,因此既有计算公式不能直接用于流量计算,而必须进行率定。通过率定拟合公式计算出流量与实测流量相对误差的绝对值在5%左右,计量精度能满足工程要求。
        Grass-planting ditch is an important transfer measure in the construction of sponge city,and it is important in academics and engineering to monitor its flow rate,However,it is difficult to directly measure the flow rate of grass-planting ditch through the existing measurement methods. This paper proposed the use of thin-walled triangular rafts and the design of a kind of trough with grass-planting ditch to determine the flow. This facility could be applied not only to monitor the in-and out-flow of grass ditch,but also to determine the flow rate of any section of grass-planting ditch without breaking the structure of grass-planting ditch. In this study,an unconventional gutter structure and an orthogonal triangle opening method had been constructed using straight slopes and arc bottoms. The curve between the head and the flow rate of the crucible was determined and compared with the theoretical formula. The result showed that,in this trough method,the calculated value of the trigonometric formula was smaller than the measured value,and their relative error was large,The maximum of relative error was 25. 9% in the experimental. It was suggested that the formula for the calculation of triangular angles couldn't be directly used to calculate the flow rate in the guttering mode,and must be calibrated. The relative error between the measured flow and the measured flow rate calculated by the fitting formula between the upper head and the flow rate determined was about 5%.The measurement accuracy met the relevant regulations and engineering requirements.
引文
[1]国务院办公厅关于推进海绵城市建设的指导意见[J].中华人民共和国国务院公报,2015,30:41-43.
    [2]Yousef Y A,Waninelista M P,Harper H H.Removal of Highway Contaminants by Roadside Swales[R].Transportation Research Board,Washington DC,1985.
    [3]美国内政部垦务局著.量水手册[M].夏富洲,刘国强,刘孟凯等译,北京:中国水利水电出版社,2011.
    [4]刘艺林.浅谈三角堰量水[J].山西地震,1982(3):1-4.
    [5]水利电力部水文局.明渠水流测量:GB/T 11828-1989[M].北京:中国标准出版社,1989.
    [6]王亚婧,王文海,秦祎,等.新型雨水径流计量用复合堰的设计及率定[J].给水排水,2015,51(4):30-33.
    [7]Herschy R W.The uncertainty in a current meter measurement[J].Flow Measurement and Instrumentation,2002(5):18-23.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700