摘要
就风景园林工程施工中存在的问题,提出注重施工工序管理,加强图纸会审阶段管理,确定最佳种植时机,注重实时养护,提高施工人员综合素养的相应措施,以促进工程施工的顺利推进,确保风景园林施工水平稳步提升。
In view of the problems existing in the construction of landscape architecture projects,this paper puts forward some corresponding measures,such as paying attention to the management of construction process,strengthening the management of the drawing examination stage,determining the best planting time,paying attention to the real-time maintenance and improving the comprehensive quality of the constructors,so as to promote the smooth progress of the construction projects and ensure the steady improvement of the construction level of landscape architecture.
引文
[1]陈心德.基于风景园林施工设计工艺探析植物选择和配置方式[J].现代园艺,2018,(24):190-191.
[2]池镇町.园林施工中存在的问题与对策及园林施工新工艺[J].现代园艺,2018,(15):196-198.
[3]邢世通.浅析当前风景园林工程施工常见问题及改进措施[J].福建建材,2017,(12):62-64.
[4]方月兰.风景园林施工管理中的常见问题和应对策略探析[J].现代园艺,2017,(22):211-212.
[5]李晓.对风景园林工程施工技术中常见问题的思考[J].城市建设理论研究(电子版),2017,(29):173.