摘要
在煤炭企业中,为了选择合理的工业场地总平面设计方案,按照多级模糊评价的要求,建立了总平面设计方案的评价指标体系,利用层次分析法确定了各层级指标间的权重分配,最终经过模糊综合评价确定各方案的优劣程度。以哈密一矿矿井工业场地总平面设计方案为例,说明基于模糊评价的总平面设计方案比选运用简单、便于实践,具有很好的实用性。
In order to select the reasonable general layout plan of project field in the coal enterprise,evaluation indicator system of general layout plan was established according to the requirement of multi-level fuzzy evaluation. Weight allocation among indicators in every level was determined by analytic hierarchy process,and finally the goodness of every alternative was obtained by the fuzzy synthetical evaluation. Taking the general layout plan of a mine project field as an illustration,it showed that the method which based on fuzzy evaluation was simple and easy to practice.
引文
[1]雷明.工业企业总平面设计[M].西安:陕西科学技术出版社,1998.
[2]刘林.应用模糊数学[M].西安:陕西科学技术出版社,1996.
[3]李善,等.煤炭企业总平面设计手册[M].北京:煤炭工业出版社,1992.
[4]王光顺,舒航.矿业经济分析数学方法[M].北京:中国标准出版社,1995.
[5]郭昭华,高红江.基于多级模糊评价的露天煤矿防洪方案决策[J].南水北调与水利科技,2011,(2):110-113.
[6]徐广红,傅群峰.模糊评价在方案设计中的应用[J].南方冶金学院学报,2002,(1):19-22.
[7]白淑娟.煤炭企业工业场地总平面设计及其优化研究[D].西安:西安建筑科技大学,2008.