用户名: 密码: 验证码:
引汉济渭来水条件下西安市多水源联合调度
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Joint operation of multiple water sources under Hanjiang River-to-Weihe River water transfer project in Xi'an City
  • 作者:刘玒玒 ; 尚宇梅 ; 张宇 ; 姜仁贵 ; 赵雪
  • 英文作者:LIU Honghong;SHANG Yumei;ZHANG Yu;JIANG Rengui;ZHAO Xue;School of Management Engineering,Xi'an University of Finance and Economics;State Key Lab Cultivation Base of Northwest Arid Ecology and Hydraulic Engineering,Xi'an University of Technology;School of Science,Air Force Engineering University;
  • 关键词:水资源 ; 联合调度 ; 多水源 ; 西安市 ; 引汉济渭
  • 英文关键词:water resources;;joint operation;;multiple water sources;;Xi'an City;;Hanjiang River-to-Weihe River water transfer project
  • 中文刊名:WSDD
  • 英文刊名:Engineering Journal of Wuhan University
  • 机构:西安财经学院管理学院;西安理工大学西北旱区生态水利工程国家重点实验室培育基地;空军工程大学理学院;
  • 出版日期:2017-02-01
  • 出版单位:武汉大学学报(工学版)
  • 年:2017
  • 期:v.50;No.244
  • 基金:西安财经学院资助教学研究项目(编号:13xcj21);; 国家自然科学基金项目(编号:51509201)
  • 语种:中文;
  • 页:WSDD201701003
  • 页数:6
  • CN:01
  • ISSN:42-1675/T
  • 分类号:27-32
摘要
2020年引汉济渭调水工程即将引水进西安,西安市将形成多水源联合供水的局面,为此,提出了多水源联合调度的供水问题.通过对西安市区用水户和供水系统的分析,在确定了调度原则的基础上,构建了多水源联合调度仿真模型.根据西安市现有水源的供水规模,以及引汉济渭调水工程各受水区实际情况和调水量规划,为西安市假定了7种多水源联合调度方案,得出不同方案下多水源联合调度结果,水平年2020年,调水量为4×10~8 m~3时,比不调水新增供水量3.1×10~8 m~3,占总需水量的20.3%;调水量为4×10~8 m~3时,比调水量为2×108 m3时新增工业供水量1.77×10~8 m~3.结果表明,工程通水后可有效缓解西安市水资源短缺状况,同时在改善河道生态环境和保证水库灌区灌溉需水方面发挥重要作用.
        As the Hanjiang River-to-Weihe River water transfer project diverts water into Xi'an in 2020,problems of joint operation would be proposed with chances of fulfilling water supply on multiple water sources conditions.Based on analyzing the characteristics of users and water supply system in Xi'an city,operation rules are determined.The multiple water sources simulation operation model is established;and the objective is to satisfy the water demand of Xi'an city.According to the scale of water supply of the existing water Xi'an city,and each receiving area actual situation and water transfer planning of Hanjiang River-to-Weihe River water transfer project,seven joint operation of multiple water sources schemes are calculated;the results under different schemes are reached.In 2020,after diversion water 4×10~8 m~3,3.1×108 m3 more water can be supplied for intake area compared with no diversion project which is 20.3% of the total water requirement.Industrial water supply increase 1.77×108 m3 compared with diversion water2×10~8 m~3.The results indicate water shortage can be relieved effectively;and the diverted water plays a major role in improving ecological environment of the river and water requirement of reservoir irrigation.
引文
[1]张静,黄国和,刘烨,等.不确定条件下的多水源联合供水调度模型[J].水利学报,2009,40(2):160-165.Zhang Jing,Huang Guohua,Liu Ye,et al.Dispatch model of combined water supply multiple sources under the conditions of uncertainty[J].Journal of Hydraulic Engineering,2009,40(2):160-165.
    [2]刘建林,马斌,解建仓,等.跨流域多水源多目标多工程联合调水仿真模型——南水北调东线工程[J].水土保持学报,2003,17(1):75-79.Liu Jianlin,Ma Bin,Xie Jiancang,et al.Simulation model of multi-reservoir and multi-consumer and multiwork for water united regulation of cross-drainage basin——For example of the east route of the South-toNorth Water Transfer Project[J].Journal of Soil and Water Conservation,2003,17(1):75-79.
    [3]畅建霞,姜瑾.引汉济渭调水工程水资源配置研究[J].自然资源学报,2011,26(1):110-118.Chang Jianxia,Jiang Jin.Water dispatch of the Southto-North Water Transfer Project in Shaanxi Province[J].Journal of Natural Resources,2011,26(1):110-118.
    [4]Yeh G.Water resource systems models:Their role in planning[J].Journal of Water Resource Planning and Management,1992,118(3):215-223.
    [5]Avi O,Dimitri K,Uri S.Reliability simulation of water distribution system-single and multi-quality[J].Urban Water,2002,4:53-61.
    [6]李文莉.西安市多种水源联合供水调度管理系统[D].西安:西安理工大学,2003.Li Wenli.Optimized control system of multi-water resource of Xi’an City[D].Xi’an:Xi’an University of Technology,2003.
    [7]徐建新,郝志斌,蒋晓辉,等.区域水资源系统动力学特征分析[J].水科学进展,2008,19(4):519-524.Xu Jianxin,Hao Zhibin,Jiang Xiaohui,et al.Analysis of dynamic characteristics for the regional water resources system[J].Advances in Water Science,2008,19(4):519-524.
    [8]Hong Zhang,Heng Li,Tam C M.Permutation based particle swarm optimization for resource constrained project scheduling[J].Journal of Computing in Civil Engineering,2006,20(2):141-149.
    [9]Hamalalnen R,Kettunen E,Ehtamo H.Evaluating a framework for multi-stakeholder decision support in water resources management[J].Group Decision and Negotiation,2001,10(4):331-353.
    [10]齐子超.南水北调来水条件下北京市多水源联合调度研究[D].北京:清华大学,2011.Qi Zichao.Joint operation of multiple water sources in Beijing[D].Beijing:Tsinghua University,2011.
    [11]张永永,黄文政,黄强,等.陕西省南水北调受水区水资源供水情势综合评价[J].资源科学,2010,32(8):1499-1504.Zhang Yongyong,Huang Wenzheng,Huang Qiang,et al.Situations on water resources of the benefited areas of the South-to-North Water Transfer Project in Shaanxi Province[J].Resources Science,2010,32(8):1499-1504.
    [12]Lee D J,Howitt R E,Marino M A.A stochastic model water quality:application to salinity in the Colorado River[J].Water Resources Research,1993,29(3):475-483.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700