针对斯维奇直驱永磁轴带发电机穿轴工艺复杂、安装要求高、工程技术人员对其不甚了解等问题,介绍斯维奇永磁轴带发电机穿轴前的准备工作,包括穿轴前防护检查,穿轴时的环境要求和安全要求以及需要准备的工具清单,陈述穿轴工作的工序,指出穿轴过程中的注意事项。
The process of intermediate shaft installation to THE SWITCH direct drive permanent magnet shaft generator is very complex with high installation requirements,and the seaman generally don't know much about it. The preparation work before piercing shaft of THE SWICH direct drive permanent magnet shaft generator was introduced,such as protection inspection,environmental and safety requirements,and tool list to be prepared. The process of shaft piercing was expounded,matters needing attention in the process were pointed out.
引文
[1]Jussi Puranen.永磁直驱轴带发电机在船舶中的应用技术比较:同步发电机和永磁发电机在轴带发电机中的应用[J].船舶工程,2017(6):19-22.
[2]沪东重机有限公司.带有轴带发电机的螺旋桨轴系的对中方法:CN108189962A[P].2017-12-28.
[3]冯杨.船舶永磁轴带发电系统研究[D].大连:大连海事大学,2017.
[4]南京金陵船厂有限公司.带有永磁式抱轴轴带发电机的船舶轴系校中工艺:CN108177727A[P].2017-12-26.
[5]中船澄西船舶修造有限公司.轴带发电机调整工装:CN103312080A[P].2013-05-21.
[6]JASSI PURANEN.Installation manual-permanent magnet madime PMM100[R].Helsinki:The Switch Co,Ltd,2017.
[7]Christion Marine-Video-EA-Shaft Generator Installation[R].Helsinki:The Switch Co.,Ltd,2017.
[8]宋任健,张华东.永磁直驱轴发对轴系校中的影响[J].内燃机与配件,2018(10):83-86.
[9]FRIEDRICH.Conv 402464 P-21302 Shafting alignment analysis APPF[R].Frederikshavn:MAN Alpha Co.,Led,2017.
[10]MARKUS.MAN Alpha VBS 1350 Plant specific data[R].Frederikshavn:MAN Alpha Co.,Ltd,2017.
[11]郑佳俊.主机&轴系&离合器&轴发装配指导工艺[R].江阴:中船澄西船舶修造有限公司,2017.
[12]郑佳俊.永磁直驱轴发校中工艺指导文件[R].江阴:中船澄西船舶修造有限公司,2017.