对攀钢集团西昌钢钒炼钢厂炼钢生产各工序能力进行分析,指出制约系统产能提升的物流瓶颈环节,采取了铁水罐扩容、缩短炼钢转炉冶炼周期、减少铸机调宽次数等措施,采取措施后,炼钢系统生产能力由1.15万t/d提高至1.30万t/d,为钢铁生产的顺行奠定了基础。
The capacity of every process during steelmaking in Steelmaking Plant of Xichang Steel Vanadium Co., Ltd. of Pangang Group Corporation was analyzed and then the bottleneck for restricting the production capacity was pointed out. For this bottleneck, such measures as expanding the capacity of a hot metal ladle, shortening the tap-to-tap cycle for steelmaking in converter and reducing the times for adjusting the width of the caster were taken. After that the production capacity of steelmaking system was increased to 13.0 thousand tone molten steel per day from 11.5 thousand tone molten steel per day, which laid the foundation for smooth operation in production of ironmaking and steelmaking.
引文
[1]殷瑞钰.冶金流程工程学[M].北京:冶金工业出版社, 2004.
[2]殷瑞钰.钢铁制造流程的解析和集成[J].金属学报, 2000(10):1077-1084.
[3]刘青,王刚,王彬,等.基于产品结构的炼钢—连铸区段产能解析[J].重庆大学学报, 2014, 37(1):75-83.
[4]刘青,尹佳,田新中,等.转炉炼钢厂工序产能和品种钢铸机配置[J].北京科技大学学报, 2007, 29(8):845-849.
[5]尹佳,刘青,田新中,等.邢钢BOF-LF-CCM工序产能匹配研究[J].炼钢, 2008, 24(3):21-24.
[6]殷瑞钰.新世纪以来中国炼钢-连铸的进步及命题[J].中国冶金, 2014,24(8):1-9.
[7]董金刚,冯太国,唐立新.钢铁企业工序能力匹配关系思考[J].中国冶金, 2007, 17(10):58-60.