水平定向钻铺管过程中回拖力计算方法的改进
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Calculation method improvement for the backtow force in pipelaying process of horizontal directional drilling crossing
  • 作者:肖守金 ; 刘永松 ; 武尚
  • 英文作者:Xiao Shoujin1, Liu Yongsong2, Wu Shang1 1. Faculty of Engineering, China University of Geosciences (Wuhan), Wuhan, Hubei, 430074 2. SINOPEC Qinghe Oil Production Plant of Jianghan Oilfield Company, Weifang, Shandong, 262714
  • 关键词:水平定向钻 ; 扩孔器 ; 钻杆 ; 回拖力 ; 计算方法
  • 英文关键词:horizontal directional drilling, bore reamer, drill rod, backtow force, calculation method
  • 中文刊名:YQCY
  • 英文刊名:Oil & Gas Storage and Transportation
  • 机构:中国地质大学(武汉)工程学院;中国石化江汉油田分公司清河采油厂;
  • 出版日期:2013-03-11 15:03
  • 出版单位:油气储运
  • 年:2013
  • 期:v.32;No.291
  • 语种:中文;
  • 页:YQCY201303021
  • 页数:4
  • CN:03
  • ISSN:13-1093/TE
  • 分类号:94-97
摘要
针对目前水平定向钻穿越施工时回拖力只考虑管道回拖力而忽略钻杆和扩孔器回拖力的问题,提出应综合考虑穿越地层地质条件、管道拉力、孔壁摩擦力和流体阻力等因素,建立回拖力的计算模型。介绍了ASTM(American Society of Testingand Material)的回拖力计算方法,并在其基础上推导了考虑钻杆和扩孔器回拖力的回拖力计算方法。通过对两个不同地层条件的工程实例进行模拟计算,考虑钻杆和扩孔器回拖力的回拖力与实际回拖力的最大误差为2.4%,计算结果比仅考虑管道回拖力时更接近实际回拖力。
        For the problem existing in HDD (Horizontal Directional Drilling) crossing construction, the backtow force of pipeline is often considered, but the backtow force of drill rod and bore reamer is neglected. In the paper, the factors to be considered in geological condition of crossing formations, pipeline pulling force, bore wall friction and fluid resistance are proposed, and calculation model for backtow force is established. The backtow force calculation method based on ASTM (American Society of Testing and Material) is introduced and the calculation method considering the backtow force of drill rod and bore reamer are derived. Researchers have performed simulation calculation for two project examples with different stratigraphic conditions, the maximum error between the backtow force considering the drill rod and bore and the actual pulling backtow forece is 2.4%, the calculated results are more closer to the actual backtow force than that of only considering pipeline backtow force.
引文
[1]钟鸣.PE给水管道水平定向地下穿越回拖力计算的探讨[J].工程建设与设计,2011(11):141-143.
    [2]颜纯文,Stein D.非开挖地下管道施工技术及其应用[M].北京:地震出版社,1992:10-11.
    [3]孙晓宝,姜伟.水平定向钻设计考虑因素[J].国外油田工程,2009,25(5):44-45.
    [4]朱波,张永高.应用水平定向钻安装管道时回拖拉力的计算方法[J].筑路机械与施工机械化,2005,22(10):41-44.
    [5]Polak M A,Lasheen A.Mechanical modelling for pipes inhorizon tald irection aldrilling[J].Tunnelling and Underground Space Technology,2002,16(1):47-55.
    [6]Baumert M E,Allouche E N.Methods for estimating pipe pullback loads for HDD crossings[J].J Infrastruct Syst,2002,8(1):12-19.
    [7]马保松.非开挖工程学[M].北京:人民交通出版社,2008:357-376.
    [8]杨先亢,遆仲森,马保松,等.水平定向钻管道穿越回拖力计算公式的比较分析[J].石油工程建设,2011,37(1):1-5.
    [9]刘鹤年.流体力学[M].2版.北京:中国建筑出版社,2004:15-37.
    [10]安金龙.水平定向钻穿越回拖力的计算方法及其分析[J].石油工程建设,2008,17(1):21-26.