摘要
城市轨道交通盾构隧道中最重要的是保证横向贯通测量的精度。该文以济南轨道交通某1500m的盾构隧道贯通测量为例,通过对地面控制测量、两井定向优化增加检核条件、布设地下主副导线环及交叉导线网、增加陀螺定向边等方法的综合运用,控制盾构隧道的横向贯通测量精度,保证了隧道的顺利贯通。该工程为今后类似工程提供了借鉴。
The most important thing for urban rail transit shield tunnel is to ensure the accuracy of lateral through survey. This paper takes a 1500 m shield tunnel of Jinan subway as an example. Through the comprehensive application of ground control survey,additional checking conditions of two-wells orientation optimization,laying main and auxiliary underground traverse rings and cross traverse networks,and increasing gyro orientation edge,the lateral through survey accuracy of shield tunnel is controlled,the smooth penetration of tunnel is ensured. The engineering provides a reference for similar projects in the future.
引文
[1]秦长利.城市轨道交通工程测量.北京:中国建筑工业出版社,2008
[2]北京交通大学组织编写.轨道交通工程监测测量管理与技术.北京:中国建筑工业出版社,2013
[3]张先锋等编著.轨道交通工程测量技术指南.北京:人民交通出版社,2013
[4]陈方敏.吊钢丝联系三角形法在隧道测量大型深竖井定向中的应用.城市勘测,2010(2):135,136
[5]李昶.特长隧道洞内平面控制测量方法探讨.交通科技与经济,2008(2):18,19
[6]成枢,武光耀,纪萍.轨道交通隧道贯通测量方法的改进与精度分析.测绘通报,2017(1):115~118
[7]程飞.全站式陀螺仪的定向方法及数据处理研究:[学位论文].阜新:辽宁工程技术大学,2014
[8]GB/T 50308-2017城市轨道交通工程测量规范
[9]谢友鹏,赵尘衍.陀螺定向在隧道盾构平面控制测量检核中的应用.城市勘测,2018(2):148~151