摘要
2010年8月13日苦水沟暴发了较大规模的泥石流,致使主河短时堵塞并溃决,造成了较大灾害。为此研究了苦水沟泥石流形成的物源条件、地形条件、降雨条件及基本特征,根据沟道内取样及泥石流的洪痕断面计算了泥石流的重度、屈服应力、流速流量等静动力学参数,分析了苦水沟泥石流堵河的可能性,并提出相应的防治措施。
In August 13,2010,Kushui gully occurred large-scale debris flow,blocked the main river,caused dam break and disaster.This article studies the causes of debris flow of available loose materials,landform,water conditions and basic characteristics.According to the sample and flood tracking section in gully,it calculates the static and kinetic parameters,such as the density of debris flow,yield stress,velocity and flow.And then,the possibility of blocking river by Kushuigou debris flow is analyzed.Finally,some prevention countermeasures are put forward.
引文
[1]乔建平,黄栋,杨宗佶,等.汶川地震极震区泥石流物源动储量统计方法讨论[J].中国地质灾害与防治学报,2012,23(2):1-6.
[2]四川省水利电力厅.四川省中小流域暴雨洪水计算手册[R].成都:四川省水利电力厅,1984.
[3]吴积善,田连权,康志成,等.泥石流及其综合治理[M].北京:科学出版社,1993.
[4]钟敦伦.试论地震在泥石流活动中的作用[A].泥石流论文集(1)[C].重庆:科技文献出版社重庆分社,1981:30-35.
[5]唐川,梁京涛.汶川震区北川9.24暴雨泥石流特征研究[J].工程地质学报,2008,16(6):751-758.
[6]许强.汶川大地震诱发地质灾害主要类型与特征研究[J].地质灾害与环境保护,2009,20(2):86-93.
[7]余斌.根据泥石流沉积物计算泥石流容重的方法研究[J].沉积学报,2008,26(5):789-796.
[8]余斌.不同容重的泥石流淤积厚度计算方法研究[J].防灾减灾工程学报,2010,30(2):207-211.
[9]余斌.粘性泥石流的平均运动速度研究[J].地球科学进展,2008,23(5):524-532.
[10]陈德明,王兆印,何耘.泥石流入汇对河流影响的实验研究[J].泥沙研究,2002(3):22-28.