摘要
采煤工作面布置受地质条件限制,当煤层在某一区段范围内出现分层现象,而主采煤层与回采巷道又不处于同一层位,且两层煤的层间距较近,这时就要考虑支护与顶底板的关系,文章主要阐述了工作面从煤层下分层穿层过层间距小于6.0m老巷的方法。
Coal mining working face layout is restricted by geological conditions. When the coal seam is stratified in a certain section,and the main coal seam and stoping roadway are not in the same horizon, and two layers of coal layer spacing is close, we need to consider the relationship between supporting and the roof and floor. The article mainly expounds the method of working face penetrating old roadways with layer spacing less than 6.0 m under the coal seam.
引文
[1]何向宁,陈勇,秦征远.综放工作面过空巷技术研究及应用[J].煤炭科学技术,2017(06).
[2]丁辉.综采工作面过空巷技术探讨[J].煤,2015(12).
[3]许谦.综放工作面回采快速过不同层位空巷研究与实践[J].煤,2016(10).