摘要
通过对龙门吊设置方案进行科学合理的优化,有效降低桥梁施工对既有设备的影响,制定切实可靠的施工方案,强化施工安全风险控制,确保施工安全和行车安全,为今后类似条件下该结构桥梁施工提供参考。
Through the scientific and reasonable optimization of the gantry crane setup scheme,we effectively reduce the influence of the bridge construction on the existing equipment,formulate the practical and reliable construction plan,strengthen risk control of the construction,to ensure the construction safety and driving safety,providing reference for the bridge construction under similar conditions in the future.
引文
[1]TZ 203-2008客货共线铁路桥涵工程施工技术指南[S].