摘要
博贺湾大桥主墩承台为大体积混凝土基础,施工中通过一系列温控措施,有效地控制了温度裂缝的发生,通过对承台大体积混凝土施工的温控措施进行研究和总结,可为今后类似工程施工提供借鉴经验。
The main pier cap of Bohewan Bridge is a mass concrete foundation.Through a series of temperature control measures during construction,the occurrence of temperature cracks is effectively controlled.The temperature control measures for the mass concrete construction of the cap are studied and summarized.It can provide reference experience for similar engineering construction in the future.
引文
[1]李志刚,魏宁.露水河大桥主墩承台大体积混凝土施工技术[J].福建建材,2011(1):87-88.
[2]肖德裕.新光大桥主墩承台大体积砼浇筑温控技术措施[J].贵州工业大学学报:自然科学版,2015,37(3):156-160.
[3]段仁前,蒲坚,刘剑雄.板沙尾大桥主墩承台施工方案[J].四川建材,2016,32(6):136-137.
[4]万华,谭振华.南洞庭特大桥主桥承台大体积混凝土防裂施工技术[J].中外公路,2017(3):141-144.