基于正交试验原理的某铁矿床采场参数优化
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Optimization of Stope Parameters for an Iron Ore Deposit Based on Orthogonal Experiment Theory
  • 作者:李宁 ; 汪为平 ; 肖益盖 ; 李何林
  • 英文作者:LI Ning;WANG Weiping;XIAO Yigai;LI Helin;Sinosteel Maanshan Institute of Mining Research Co.,Ltd;State Key Laboratory of Safety and Health for Metal Mine;Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co.,Ltd;
  • 关键词:厚大矿体采场参数 ; FLAC~(3D)数值分析 ; 正交试验 ; 极差分析
  • 英文关键词:Stope parameters of thick ore body;;FLAC~(3D) numerical analysis;;Orthogonal experiment;;Range analysis
  • 中文刊名:KYYK
  • 英文刊名:Mining Research and Development
  • 机构:中钢集团马鞍山矿山研究院有限公司;金属矿山安全与健康国家重点实验室;华唯金属矿产资源高效循环利用国家工程研究中心有限公司;
  • 出版日期:2019-07-17
  • 出版单位:矿业研究与开发
  • 年:2019
  • 期:v.39;No.228
  • 语种:中文;
  • 页:KYYK201907012
  • 页数:5
  • CN:07
  • ISSN:43-1215/TD
  • 分类号:55-59
摘要
为了保证厚大矿体回采采场稳定,提高矿石回采的安全可靠性、降低支护成本、提高生产效率,以霍邱地区某大型沉积型铁矿床为例,对影响采场稳定性的矿房长度、宽度、高度三个主要因素进行正交试验设计,基于正交试验原理,运用有限差分软件FLAC~(3D)进行了9种方案数值模拟,分析了不同采场参数下周围岩体最大拉应力、最大压应力和位移沉降量分布特征。通过极差分析表明,影响矿房稳定性的主要因素为矿房回采长度,其次是采场高度,采场宽度对采场稳定性影响最小;同时确定某铁矿厚大型矿体回采矿房长、宽、高参数分别为60,20,100m时,最有利于采场稳定。
        In order to ensure the stope stability of thick and large ore body,improve the safety and reliability of ore mining,reduce the cost of support and improve the production efficiency,taking a large sedimentary iron ore deposit in Huoqiu area as an example,the orthogonal experimental design was carried out for three main factors affecting the stope stability,namely,the length,width and height of the room.Based on orthogonal experiment theory,nine schemes were numerically simulated by using the finite difference software FLAC~(3D),and the distribution characteristics of the maximum tensile stress,the maximum compressive stress and displacement settlement of surrounding rock mass under different stope parameters were analyzed.The range analysis showed that the main factor affecting the room stability was the length of the room,secondly was the height of the stope,and the width of the stope had the least influence on the stope stability.At the same time,it was determined that the length,width and height parameters of a thick and large ore body in this iron mine were 60,20 mand 100 mrespectively,which was the most conducive to stope stability.
引文
[1]钨金,李元辉,司呈斌,等.深埋厚大矿体采场参数结构优化[J].金属矿山,2014,461(11):11-15.
    [2]兰明,刘志祥,李夕兵,等.中深孔崩矿阶段嗣后充填法采场结构参数优化[J].中南大学学报(自然科学版),2018,49(4):933-939.
    [3]周海麟,陈玉明.某矿采场极限暴露面积与结构参数优化[J].矿冶,2018,27(2):39-42.
    [4]翟会超,丁航行,胡巍巍.急倾斜厚大矿体空场嗣后充填法矿房结构参数计算[J].金属矿山,2017,498(12):6-9.
    [5]徐帅,安龙,李元辉,等.基于SOM的深埋厚大矿体采场结构参数优化研究[J].采矿与安全工程学报,2015,32(6):884-889.
    [6]张飞,杨天鸿,胡高建.复杂应力扰动下围岩稳定性评价与采场参数优化[J].东北大学学报:自然科学版,2018,39(5):700-705.
    [7]李云雁,等.试验设计与数据处理[M].北京:化学工业出版社,2008:225-232.
    [8]薛美英.超大跨度采场结构参数优化研究[J].矿业研究与开发,2016,36(9):14-18.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700