摘要
隧道工程是铁路工程施工中常见的结构形式之一,但是由于其施工环境复杂多变,故隧道施工的难度极大。就某项目在施工过程中采取的注浆工艺进行论述,研究注浆理念,分析原理,熟悉工艺、掌握质量控制关键点,很大程度上解决了隧道施工的困难,提升了整体的安全质量。
Tunnel engineering is one of the common structural forms in railway engineering construction. However,due to the complex and variable construction environment,tunnel construction it is very difficult. This paper discusses the grouting process adopted during the construction of a project,studies the grouting concept,analyzes the principle,is familiar with the process,and masters the key points of quality control,which largely solves the difficulties of tunnel construction and improves the overall safety and quality.
引文
[1]宋新杰,高强.铁路隧道大型溶腔注浆加固施工技术[J].铁道建筑,2007(4):57–59.
[2]张旭珍.马丽散.在铁路特长隧道径向注浆中的应用研究[J].铁道标准设计,2016,60(8):105–108.
[3]卢永堂.超前帷幕预注浆技术在岩溶隧道施工中的应用[J].铁道标准设计,2007(7):102–106.
[4]杨昌贤,马志富,张凤武,等.牡绥铁路双丰隧道富水第三系砂泥岩地层超前注浆加固施工技术[J].铁道标准设计,2017,61(7):125–130.
[5]高广义,陈立杰.象山隧道岩溶段注浆技术优化研究[J].隧道建设,2011,31(1):98–103.