用户名: 密码: 验证码:
浅谈工程咨询在我国核设施退役中的应用和困难
详细信息    查看官网全文
摘要
随时间的推移,许多铀矿山面临资源枯竭,核电厂、反应堆达到设计寿命,核设施退役迎来巨大市场前景;工程咨询在核设施退役中的应用可以提高退役工程质量,提高资金使用效益,合理解决业主与承包方之间分歧与纠纷,但我国工程咨询单位参与我国核设施退役建设仍面临诸多困难。
As time goes on,the resource of many uranium mines has been running out,the nuclear power plants and reactors are getting to their lifetime of service,due to which the nuclear facility decommissioning greets a huge market prospect,the application of engineering consultation in nuclear facility decommissioning can improve the project's quality,and can improve the efficiency of using money,and can resolve differences and disputes between owner and contractor,however the engineering consulting firms still have a lot of difficulties,while involved in the decommission business in china.
引文
[1]吴春喜,等.核大国核设施退役与放射性废物管埋概况.会议论文,2001.
    [2]罗上庚.论退役策略.核安全,2011(1).
    [3]潘英杰,等.铀矿冶设施退役治理效果评价及资金投入分析.会议论文,2012.
    [4]韩国胜,等军工放射性废物管理设施安全监管措施的探讨.会议论文,2012.
    [5]谷存礼,等.国营750厂核设施退役实践.会议论文,2005.
    [6]黄治俭,等.国营二二一厂核设施退役实践.辐射防护,2005(2).
    [7]夏延龄.101重水研究堆退役.会议论文,2004.
    [8]余健明.工程咨询概论.中国计划出版社.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700