以北京地区典型砂卵石地层盾构工程为背景,从现场掘进试验出发,辅以理论推导与数值模拟分析,以土压平衡盾构施工关键参数为对象,研究了土压平衡盾构与砂卵石地层的适应性特征。系统总结与归纳了北京典型砂卵石地层大粒径卵石、漂石空间分布规律及力学特征,着重从强度、渗透性、颗粒级配、密实度及地层化学成分等方面分析了盾构的适应性要求。根据盾构的几何构造特征及施工特点,推导了土压平衡盾构关键施工参数的理论计算模型,并分析了关键参数的构成及主要影响因素。开展了盾构的现场掘进和土体改良试验,分析了盾构关键参数的变化规律及相关性特征,研究了北京典型砂卵石地层两种刀盘结构型式土压平衡盾构的适应性;同时总结了土压平衡盾构在北京典型砂卵石地层中施工时土体改良剂与盾构掘进模式的匹配性及适应性。利用FLAC3D模拟了砂卵石地层盾构开挖面稳定性特征及地表沉降规律,并分析了开挖面稳定性与支护压力的关系。
As for the key construction parameters of EPB TBM in typical gravel strata of Beijing area, it is studied for its feasibility of EPB TBM and the typical gravel in Beijing Metro with the help of field tests, theoretical research and numerical simulation at the background of EPB TBM excavated in typical gravel strata in line9of Beijing Metro. Mechanical properties and the space distribution rules of large size gravels and boulders are analyzed.And the feasibility requirements of EPB TBM are discussed at the base of strength, permeability, grain composition, compactedness and chemical composition of typical gravel strata in Beijing Metro. According to geometric structure characteristics and construction features of EPB TBM, the theoretical calculation formulas of key parameters are introduced, and its composition and the main influence factors are proposed considering the mechanical characteristics of typical gravel strata. Through field advancing and soil conditioning tests, it is studied that the adaptability of construction parameters with soil properties, internal relationships among these parameters, as well as match relationships and adaptability characteristics of soil improver with advancing modes of EPB TBM in typical gravel strata. Finally, finite difference software FLAC3D is used for simulating the excavation process of EPB TBM in typical gravel strata. At the same time, stability features of EPB TBM tunnel face and laws of ground surface subsidence, and relationships between stability of tunnel face and support pressure are analyzed.
引文
1.程骁等.盾构施工技术[M].上海:上海科学技术文献出版社,1990
    2.刘建航,侯学渊.盾构法隧道[M].北京:中国铁道出版社,1991
    3.孙钧.地下结构(上、下)[M].北京:科学出版社,1991
    4.陶龙光,巴肇伦.城市地下工程[M].北京:科学出版社,1996
    5.施仲衡.地下铁道设计与施工[M].西安:陕西科学技术出版社,1997
    6.张凤祥,朱合华,傅德明.盾构隧道[M].北京:人民交通出版社,2004
    7.朱合华.地下建筑结构[M].北京:中国建筑工业出版社,2005
    8.王春河.深圳地铁盾构始发与到达端头加固理论研究与工程实践[D].中国矿业大学(北京)博士学位论文,2010
    9.江玉生,干春河,江华等.盾构始发与到达—端头加固理论研究与工程应用[M].北京:人民交通出版社,2011
    10.傅德明.我国隧道盾构掘进机技术的发展现状[J].地下工程技术,2003
    11.周文波.盾构法隧道施工技术及应用[M].北京:中国建筑工业出版社,2004
    12.北京地铁及地下工程建设风险管理指南[M].北京:中国建筑工业出版社,2007
    13.尹旅超等译.日本盾构隧道新技术[M].武汉:华中理工大学出版社,1999
    14.日本土木学会编,朱伟译.隧道标准规范(盾构篇)及解说[M].北京:中国建筑工业出版社,2001
    15.崔玖江.隧道与地下工程修建技术[M].北京:科学出版社,2005
    16.夏明耀等.地下工程设计施工手册[M].北京:中国建筑工业出版社,1999
    17.陈丹,袁大军,张弥.盾构技术的发展与应用[J].现代城市轨道交通,2005(5):25-29
    18.北京市轨道交通建设管理有限公司.安全风险技术管理体系(试行)[M].2008
    19.刘建航,侯学渊.盾构法隧道[M].北京:中国铁道出版社,1991
    20.竺维彬,鞠世健.复合地层中的盾构施工技术[M].北京:中国科学技术出版社,2005
    21.竺维彬,鞠世健,史海欧.广州地铁三号线盾构隧道工程施工技术研究[M].广州:暨南大学出版社,2007
    22.陈馈,洪开荣,吴学松.盾构施工技术[M].北京:人民交通出版社,2009
    23.乐贵平,江玉生.北京地区盾构施工技术[J].都市快轨交通,2006,19(2):18-23
    24.何川.第五届中日盾构隧道技术交流论文集[M].成都:西南交通大学出版社,2009
    25.何川,张建刚,苏宗贤等.大断面水下隧道结构力学特征[M].北京:科学出版社,2010
    26.陈韶章,洪开荣,张弥.复合地层盾构设计概论.北京:人民交通出版社,2010
    27.王江涛,陈建军,吴庆红等.南水北调中线穿黄工程盾构施工技术[M].郑州:黄河水利出版社,2010
    28.江玉生,杨志勇,蔡永立.盾构/TBM隧道施工实时管理信息系统[M].北京:人民交通出版社,2007
    29.张厚美.盾构隧道的理论研究与施工实践[M].北京:中国建筑工业出版社,2009
    30.地盘工学会,牛清山.盾构法的调查·设计·施工[M].北京:中国建筑工业出版社,2008
    31.谭雪.地铁区间隧道盾构选型及其适应性评估[M].中国矿业大学(北京)硕士学位论文,2007
    32.凌京蕾,樊丽珍.盾构技术及其在广州地铁的应用[J].广西科技,2000,21(1):25-32
    33.于颖,徐宝富,奚鹰.软土地基土压平衡盾构切削刀盘扭矩的计算[J].岩石力学与工程学报,2004,2(3):314-317
    34.张厚美,吴秀国等.土压平衡式盾构掘进试验及掘进数学模型研究[J].岩石力学与工程学报,2005,24(增刊2):5763-5764
    35.崔国华,王国强,何恩光等.盾构掘进机主要技术参数的计算分析[J].矿山机械,2006,34(12):11-14
    36.杨洪杰,傅德明,葛修润.盾构周围土压力的试验研究与数值模拟[J].岩石力学与工程学报,2006,25(8):1652-1657
    37.刘明月,赵维刚,张筑平。全断面隧道掘进机工作参数匹配规律的挖掘与利用[J].石家庄铁道学院学报,2006,19(3):55-59
    38.吕强,付德明.土压平衡盾构掘进刀盘扭矩模拟试验研究[J].岩石力学与工程学报,2006,25(增1):3138-3143.
    39.管会生,高波.盾构切削刀具寿命的计算[J].工程机械,2006,26(1):45-51
    40.王洪新.土压平衡盾构刀盘扭矩计算及其与盾构施工参数关系研究[J].土木工程学报,2009,42(9):109-113.
    41.徐前卫,朱合华,丁文其等.均质地层中士压平衡盾构施工刀盘切削扭矩分析[J].岩土工程学报,2010:32(1):47-54
    42.曾晓星,余海东,张凯之等.盾构机复合岩土层掘进刀盘弯矩特征分析[J].上海交通大学学报,2010,44(1):51-55
    43.邓立营,刘春光,党军峰.盾构机刀盘扭矩及盾体推力计算方法研究[J].矿山机械,2010,38(17):13-16.
    44. Szechy, K. The art of tunneling, Akademiai kiado, Budapest,1996, pp.891
    45.徐前卫,朱合华,廖少明等.均匀软质地层条件下土压平衡盾构施工的合理顶进推力分析[J].岩土工程学报,2008,30(1):79-85.
    46.李强,曾德顺.盾构千斤顶推力变化对地面变形的影响[J].地下空间,2002,22(1):12-15
    47.朱合华,徐前卫,廖少明等.土压平衡盾构顶级推力的模型试验研究[J].岩十力学,2007,28(8):1587-1593
    48.晏启祥,耿萍,何川.地铁砂卵石地层采用加泥式土压平衡盾构机的设备配置及顶推力检算[J].隧道建设,2007,27(6):19-21
    49.苏健行,龚国芳,杨华勇.土压平衡盾构掘进总推力的计算与试验研究[J].工程机械,2008,39:13-15.
    50.邓颖聪.盾构推进系统的分区建模与性能评价[D].上海交通大学硕土学位论文,2010
    51.宋克志.泥岩砂岩交互地层越江隧道盾构掘进效能研究[D].北京:北京交通大学,2005
    52.宋克志,孙谋.复杂岩石地层盾构掘进效能影响因素分析[J].岩石力学与工程学报,2007,26(10):2093-2094
    53.宋克志,袁大军,王梦恕.基于盾构掘进参数分析的隧道围岩模糊判别[J].土木工程学报,2009,42(1):108-109
    54.陈仲颐,周景星,王洪理.土力学[M].北京:清华大学出版社,1994
    55.王毅才.隧道工程[M].北京:人民交通出版社,2004
    56.重庆交通科研设计院等.公路隧道设计规范[M].北京:人民交通出版社,2004
    57.刘东亮.EPB盾构掘进的土压控制[J].铁道工程学报,2005,86(2):45-51
    58.胡新朋,孙谋,李建华等.地铁EPB盾构不同地层土舱压力设置问题研究[J].地下空间与工程学报,2006,8(2):1413-1417
    59.胡国良,龚国芳,杨华勇.盾构掘进机土压平衡的实现[J].浙江大学学报(工学版),2006,40(5):874-877
    60.武力,屈福政,孙伟等.基于离散元的土压平衡盾构密封舱压力分析[J].岩土工程学报,2010,32(1):18-23
    61.上官子昌,李守巨,栾茂田.土压平衡盾构机密封舱土压力优化设置问题[J].建筑技术,2009,40(12):1068-1073
    62.周尚荣.砂砾底层土压平衡盾构施工地表沉降分析与控制[D].中南大学硕士学位论文,2010
    63. MHI.Manufacturing Record on shield Machine,Mitsubishi Heavy Industry Ltd,1988
    64. Mair, R. J. Centrifugal modeling of tunnel construction in soft clay. Thesis (PhD). University of Cambridge,1979.
    65. Mair, R. J., Taylor, R.N. Prediction of clay behavior around tunnels using plasticity solutions. In:Predictive Soil Mechnics:Predictive Soil Mechanics:Proc. Wroth Memorial Symposium, Oxford,27-29 july 1992.London:Thomas Teford,449-463.
    66. Imamura, S, NommoT., Mito, K.,et al. Design and Development of Underground Construction Equipement in Centrifuge. In:Proc. International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground, London, April. Rotterdam Balkema, 531-536.
    67. Imamura S.,Hagiwara T., Mito, K., et al. Settlement Trough above a Model Shield Observed in a Centrifuge. Centriguge,1998,pp.317-719
    68. Grant, R.J., Taylor, R.N. Centrifuge Modelling of Ground Movements Due to Tunneling in Layered Ground. In:Proc. International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground, London, April. Rotterdam Balkema,507-512.
    69. Grant, R.J., Taylor, R.N. Evaluating plasticity solutions for the response of clay around tunnels. In:Proc. International Symposium On Geotechnical Aspects of Underground Construction in soft ground, Tokyo,21-23 July 1999. Rotterdam:Balkema, pp.373-378.
    70. Kim, S.H., Burd, H.J. et al. Interaction between closely spaced tunnels in clay. In: Proc.Int.Symposium on Geotechnical Aspects of Underground Construction in Soft Ground, London, April,1996. Retterdam:Balkema, pp.543-548
    71. Kashima Y., Kondo N, Inoue M. Development and Application of the DPLEX Shield Method: Results of Experiments Using Shield and Segment Models and Application of Method in Tunnel Construction.Tunnelling and Underground Space Technology, Vol.11,No.1,PP,45-50 1996
    72. Kuwano, J., Takahashi et al. Centrifuge investigation on deformations around tunnels in nailed clay. In:Proc. International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground, Tokyo,21-23 July 1999. Rotterdam:Balkema,245-250.
    73. Nakai,T. Farias, M.M.,Matsubara, et al. Effects of excavation sequence on the 3D settlement of shallow tunnels. In:Proc. International Symposium On Geotechnical Aspects of Underground Construction in soft ground, Tokyo,21-23 July 1999. Rotterdam:Balkema, pp.703-408.
    74. Peck R. B. Deep excavations and tunneling in soft ground[A].In:Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering[C].Mexico City: Sociedad Mexicana de Mecanica de Suelos,1969:225-290
    75. Kail T. Theoretical soil mechanics[M].New York:New York John Wiley & Sons,1997.
    76.周小文.盾构隧道土压力模型试验研究[D].清华大学博士学位论文,1999.
    77.张云.土质隧道土压力和地层位移的离心模型试验及数值模拟研究[D].河海大学博十学位论文,2000.
    78.将正华.城市地铁区间隧道开挖的地表沉降控制研究[D].西南交通大学硕十学位论文,2003
    79.唐益群,宋永峰,周念清等.土压平衡盾构在砂性土中施工问题的试验研究[J].岩石力学与工程学报,2005,24(1):52-56
    80.李向红,傅德明.土压平衡模型盾构掘进试验研究[J].岩土工程学报,2006,28(9):1101-1105
    81.徐前卫,朱合华等.砂土地层盾构法施工的地层适应性模型试验研究[J].岩石力学与工程学报,2006,25:2903-2905.
    82.徐前卫.盾构施工参数的地层适应性模型试验及其理论研究[D].同济大学博士学位论文,2006
    83.邢彤,龚国芳,杨华勇.盾构刀盘驱动扭矩计算模型及实验条件[J].浙江大学学报(工学版),2009,43(]0):1794-1800
    84.朱伟译.盾构标准规范(盾构篇)及解说[M].北京:中国建筑工业出版社,2001
    85.朱伟,陈仁俊。盾构隧道基本原理及在我国的使用情况[J]岩土工程界,2001,11:19-21
    86.路石.采用化学泡沫改善土压平衡盾构的掘进[J].铁道建筑,2004,12(4):58-62
    87.石本弘治,栗林恭嗣,制纸スラシヅた添加材に用ぃた土压系シ一ルド工法开发[J].土基础,1993,41(5):37-42
    88. Robert Marrit, Xavier Borghi, Soil Conditioning for Clay Soil[J].Tunnels and Tunnling Inernational,2003,(4):29-32
    89. Miguel Pena, Soil Conditioning for Sand, Tunnels and Tunnelling Inernational,2003,(7):40-42
    90. Guy Houlsby, Robert Marrit, Easing the Way Soil conditioning, Tunnels and Tunnelling Inernational,2003,(6):48-50
    91.魏康林,朱伟.盾构隧道施工技术发展新方向[J].河海大学学报(自然科学版),2001,(29):28-31
    92.张明晶.土压平衡式盾构施工中喷涌问题的发生机理及防治措施研究[D].河海大学硕士学位论文,2004
    93.郭涛.土压平衡式盾构压力舱土体力学性质改良及其机理研究[D].河海大学硕士学位 论文,2005
    94.朱伟,郭涛,魏康林.盾构用气泡的性能及对开挖土体改良效果影响[J].地下空间与工程学报,2006,2(4):571-577.
    95.秦哲,王成勇,冯尚智等.地下盾构过程中泡沫剂对刀具耐磨性的影响[J].工具技术,2006,40(8):24-26
    96.林健.土体改良降低土压平衡式盾构刀盘扭矩的机理研究[D].河海大学硕士学位论文,2006
    97.韩月旺,钟小春等.压力舱土体改良对盾构开挖面稳定影响研究[J].岩土力学,2007,28(增刊):45-52
    98.乔国刚.土压平衡盾构用新型发泡剂的开发与泡沫改良士体研究[D].中国矿业大学(北京)博士学位论文,2010
    99.马连丛.富水砂卵石地盾构施工渣土改良研究[J].隧道建设,2011,30(4):411-415
    100.闫鑫,龚秋明,姜厚停。土压平衡盾构施工中泡沫改良砂土的试验研究[J],2010,6(3):449-453
    101. Broms B B, Benermark H. Stability of clay at vertical openings[J]. Journal of Soil Mechanics and Foundations Division,1967,97(1):71-94
    102. Peck R B, Hendron A J. et al. State of the art of soft ground tunneling. Proc,1972 RETC. (Chicago).1.259-280
    103. Davis, E H, Gunn, M J et al.The stability of shallow tunnels and underground openings in cohesive material [J]. Geotechnique,1980,Vol.30.(4):397-419
    104. Leca B, Bormieux L. Upper and lower bound solutions for the stability of shallow circular tunnels in frictional material[J].Geotechnique,1990,40(4):581-606
    105. Abdul H S. Three-dimensional face stability analysis of shallow circular tunnels[C]. In: International Conference on Geotechnical and Geological Engineering Australia: Melboume,2000
    106. Jancsecz S, Steiner W. Face support for a large mix-shield in heterogenous ground conditions[A].In:Conference Proceeding Instititute of Mining and Metallurgy and British Tunnelling Society[C].London,1994:531-549
    107. Monnet J. Chaffois S, Chapeau C, et al. Theoretical and experimental studies of a tunnel face in a gravel site[A]. In:pietruszczak S, Pande G N. Numerical Models in Geomechanics[M]. Nemog Ⅲ,1989:497-514
    108. Anagnostou G, Kov'ari K. Face stability of slurry-shield-driven tunnels[J].Tunnelling and Underground Space Technology,1994,9(2):165-174
    109. Anagnostou G, Kov'ari K. Face stability conditions earth-pressure-balanced shields[J].Tunneling and Underground Space Technology,1996,11(2):165-173
    110. Anagnostou G, Kov'ari K. Face stability in slurry and EPB shield tunneling [A]. In:Mair R J, Taylor R N. Geotechnical Aspects of Underground Construction in soft Ground[M].Rotterdam:Balkema,1996,453-458
    111. Atkin J H, Potts D M. Stability of a shallow circular tunnel in cohesionless soil[J].Geotechnique,1997,27(2):203-215.
    112.魏纲.盾构施工中土体损失引起的地面沉降预测[J].岩土力学,2007,28(11):2375-2379.
    113.Chambon P, Cort'e J F. Shallow tunnels in cohesionless soil:stability of tunnel face [J]. ASCE Journal of Geotechnical Engineering,1994,(120):1148-1165
    114. Hisatake M, Eto T, Murakami T. Stability and failure mechanisms of a tunnel face with a shallow depth [A].In:T. Fujii. Proceeding of 81th Congress of the International Society for Rock Mechanics[C]. International Society for Rock Mechanics,1995:587-591.
    115.徐东,周顺华,黄广军等.上海粘土的成拱能力探讨[J].上海铁道大学学报,1999,20(6):49-54
    116.程展林,吴忠明,徐言勇.砂基中泥浆盾构法隧道施工开挖面稳定性试验研究[J].长江科学院院报,2001,18(5):53-55
    117.朱合华,徐前卫,郑七振等.软土地层土压平衡盾构施工参数的模型实验研究[J].土木工程学报,2007.40(9):87-94
    118. Bernat S, Cambou B, Dubbis P. Assessing a soft soil tunneling numerical model using field[J].Geotechnique,1999,(4):427-452
    119. Assaddi A, Sloan S W. Stability of shallow tunnels in soft ground[J]. Predictive Soil mechanics. Proc. Wroth memorial Symposium.Oxford.1992,Thomas Telford.pp:644-663
    120. Domon T,KondonT, et al. Model tests on the face stability of tunnels in granular material. Proc. Tunnels and Metropolises. eds Negro Jr & Ferreira.1998.pp:201-214
    121. Rowe R K, Lo K Y, Kack G J. A method of estimating surface settlement above tunnels constructed in soft ground [J].Canada Geotechnical Journal,1983(20):11-22
    122. Chaffois S, Lareal P, Monnet J. Study of tunnel face in a gravel site[A].In:Numerical Methods in Geomechanics.[M].Swoboda,1988:1493-1498
    123. Lee K. M, Rowe R K, Lo K Y. Subsidence owing to tunneling I Estimating the gap parameter [J].Canadian Geotechnical Journal,1992,29:929-940
    124.朱合华,丁文其,李晓军.盾构隧道施工力学形态模拟及工程应用[J].土木工程学报,2000,33(3):98-103
    125.丁春林,朱世友,周顺华.地应力释放对盾构隧道围岩稳定性和地表沉降变形的影响[J].岩石力学与工程学报,2002,21(11):1633-1635
    126. Antao A, Gomes C A. Comparison of numerical predictions of tunnel using finite element method and limit analysis with centrifugal tests[A]. In:Fernandes. Application of computational Mechanics in Geotechnical Engineering[M]. Lisse:Swets & Zeitlinger,2001:157-1664
    127.王敏强,陈宏胜.盾构推进隧道结构三维非线性有限元仿真[J].岩石力学与工程学报,2002,21(2):228-232
    128.秦建设.盾构施工开挖面变形与破坏机理研究[D].河海大学博士学位论文,2005
    129.朱伟,秦建设,卢廷浩.砂土中盾构开挖面变形与破坏数值模拟研究[J].岩土工程学报,2005,27(8):897-902
    130.吴韬.大型盾构进出洞施工技术及加固土体受力机理分析[D].同济大学硕士学位论文,2006
    131.韦良文.泥水盾构隧道施工土体稳定性分析与实验研究[D].同济大学博士学位论文,2007

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700