亚热带山地季风气候地区因其独特的地理特性,区域内地下水、地表水丰富,植被生长好,地下水位高,对用于大坝防渗体填筑的红黏土含水率控制较为困难。以亚热带山地季风气候地区某水库红黏土防渗心墙施工为例,降低红黏土含水率,控制防渗体施工质量的方法进行总结,提出了各种降低土料含水率的方法。
Due to its unique geographical characteristics,the subtropical mountain monsoon climate region is rich in groundwater and surface water,with good vegetation growth and high groundwater level. It is difficult to control the moisture content of red clay used for dam anti-seepage. This paper takes the construction of red clay anti-seepage core wall of a reservoir in subtropical mountain monsoon climate region as an example,summarizes the method of reducing the water content of red clay and controlling the construction quality of anti-seepage body,and proposes various methods to reduce the moisture content of soil material.