用户名: 密码: 验证码:
Analysis of Dam Uneven Settlement Due to Extent of Rock Dissolution in Dam Base at Hydropower Project
详细信息   
摘要

Taking a project for example, this paper analyzes the uneven settlement of dam at different dissolution degrees of dam base rock mass. The paper uses a three-dimensional numerical analysis. The result of calculation can show the following findings: the maximum displacement on dam top will be 10 cm if a strong dissolution occurs at dam base. The maximum displacement on dam top will be 5.5 cm if a middling dissolution occurs at dam base. The maximum displacement on dam top will be 4 cm if a slight dissolution occurs at dam base. The more serious of dam base dissolution, the more serious degree of uneven settlement in dam.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700