摘要
///Bayueshan tunnel is the important controlling project of the second Cheng-Yu highway (in Chongqing). According to hydrogeology investigation result of Bayueshan tunnel, the hydrogeological condition is analyzed and evaluated. Method of infiltration coefficient of precipitation, modulus method of ground water runoff, gross spring flow method, underground hydrodynamics method and etc. are adopted to calculate and forecast the rate of water inflow. On the basis of this result,the evaluation of tunnel water inflow is made.