摘要
The landslide was caused by excavation engineering.The failure mechanism is explored for slopes with soft interlayer in the red rock area of Northeast Sichuan through the analysis of the landslide’s geological conditions,rock and soil structure,soft structural surface,deformation and the monitoring data.The study provides a reference for the excavation,monitoring,warning and bracing of the slope with similar conditions.