用户名: 密码: 验证码:
Treatment Technic for Water Burst Accident of Drilling Hole in Qingyang District
详细信息   
摘要
During the construction of drilling hole for groundwater in Qingyang District,water burst accident always happened below 1060m above sea level because this position is abnormally rich in groundwater.Through analysis of the hydrogeological conditions in the work area,this paper put forward the solutions of water burst accident,such as the balance method of formation pressure,stoping gushing with sealer,water separation with water insulation casing,drilling while water gushing and so on.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700