The paper introduces the large-angle declined hole construction in Lanhigou gold deposit of Guizhou, analyzes the application process of flushing fluid and drill bit selection and sums up the experiences of large-angle declined hole drilling.
© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号 地址:北京市海淀区学院路29号 邮编:100083 电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700 |