The 34th Congress of International Association of Hydrogeologists: abstracts, Beijing, China, October 9-13, 2006
摘要
The paper deals with groundwater flow systems in tobidtic units of Mamoso Arenacea Formation(Northem Apernnine chain), involved since 1996 to present by the boring of High Speed miway tunnels connection Florence to Blolgra.