用户名: 密码: 验证码:
Efficiency and economic analysis of utilizing latent heat from groundwater freezing in the context of borehole heat exchanger coupled ground source heat pump systems
详细信息    查看全文
文摘
class="listitem" id="list_l0005">
class="label">•

A numerical model was developed to simulate BHE induced soil freezing.

class="label">•

Latent heat from freezing slows down the BHE outlet temperature drop.

class="label">•

COP corrected boundary condition produces more realistic estimation.

class="label">•

Longer BHE do not always lead to a better financial performance over 30 years.

class="label">•

Total cost of GSHPS depends heavily on electricity price and interest rate.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700