用户名: 密码: 验证码:
Combination of planning methods in a comprehensive production planning approach for sequenced production lines
详细信息查看全文 | 推荐本文 |
摘要
Medium-term sales and operations as well as medium to short-term production planning in customer order driven production processes are performed using a cascading planning process. A lack of coordination and feedback between different planning phases causes problems with a negative effect on costs in production that originate from unfeasible production programs. Based on a system for the classification of planning restrictions the planning process will be controlled utilizing a newly developed combination of the methods of Linear Programming and Constraint Programming. The result is a formal logic to combine the different planning horizons and the two sets of planning methods.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700