软弱围岩隧道的开挖施工容易造成开挖面失稳坍塌以及拱顶沉降过大等事故,须对围岩和掌子面进行加固,以保证施工安全。以宁波象山县野猪山隧道为工程背景,以新意法为理论基础,采用玻璃纤维锚杆加固隧道掌子面,通过数值分析研究了掌子面锚杆布置密度、加固长度、搭接长度等加固参数,得出掌子面玻璃纤维锚杆加固长度应大于隧道开挖直径,可提高掌子面的稳定性;对掌子面挤出变形控制较为严格的情况下,可以对全断面布置锚杆进行加固。
The excavation of soft surrounding rock tunnel is easy to cause the instability of excavation face and large ground settlement and it is necessary to ensure the construction safety by reinforcement the surrounding rock and tunnel face. In this paper, taking Yezhushan tunnel in Xiangshan country of Ningbo city as the engineering background, using ADECO-RS as the theoretical basis, and glass fiber bolts to reinforce the tunnel face, the parameters of tunnel face reinforcement such as laying density of the bolt, the reinforcement length of bolt and the lap length, are obtained by finite element analysis and theoretical analysis. It is found that, the length of the reinforcement of the glass fiber anchor of the face should be greater than the tunnel excavation diameter, which can improve the stability of the surface, and in the case of tightening control of the extrusion of the face, it is possible to reinforce the whole section of the anchor. The conclusions can be used as references for soft rock tunnel construction.
引文
[1]韩道录.软弱围岩大断面隧道超前预加固分析[D].重庆:重庆交通大学,2013.
[2] 李鹏飞,赵勇,刘建友.隧道软弱围岩变形特征与控制方法[J].中国铁道科学,2014,35(5):55-61.
[3] 赵勇.隧道软弱围岩变形机制与控制技术研究[D].北京:北京交通大学,2012.
[4] 毛燕飞.基于岩土控制变形分析法的软弱围岩隧道开挖变形控制技术[D].西安:长安大学,2015.
[5] 关岩鹏,黄明利,彭峰.大断面软岩隧道新意法加固参数研究[J].公路交通科技,2013,30(3):105-110.
[6] 任伟明,彭丽云.新意法及其预约束施工技术[J].施工技术,2013,42(1):83-87.
[7] 崔柔柔,杨其新,蒋雅君.软岩隧道掌子面玻璃纤维锚杆加固参数研究[J].铁道标准设计,2015,59(11):79-82.
[8] 李斌,漆泰岳,吴占瑞,等.隧道掌子面锚杆加固参数确定方法[J].铁道学报,2012,34(10):115-121.