摘要
城市设施不断提升,公用事业的地下管线分布密集、涉及面广,传统开挖技术已不适用于现代化的建设。因此,基于佛山市电力电缆的现状,讨论分析了高压电缆的敷设难度、工程造价及故障排查等,并选择了排管形式较优的方案。
Urban facilities have been continuously upgraded,and the underground pipelines of public utilities are densely distributed and widely involved. Traditional excavation techniques are no longer suitable for modern construction. Therefore,based on the current situation of the power cable in Foshan city,the difficulty of laying,engineering cost and fault checking of the high-voltage cable are discussed,and a better scheme of drainage is chosen.