用户名: 密码: 验证码:
基于运行可靠性理论的高可靠性供电路径搜索方法
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:The High Reliability Supply Path Searching Method Based on the Operational Reliability Theory
  • 作者:刘满君 ; 程林 ; 黄道姗 ; 叶小晖 ; 徐振华
  • 英文作者:Liu Manjun;Cheng Lin;Huang Daoshan;Ye Xiaohui;Xu Zhenhua;State Key Lab of Control and Simulation of Power Systems and Generation Equipments Department of Electrical Engineering Tsinghua University Beijing 100084 China;State Key Lab of Control and Simulation of Power Systems and Generation Equipments Department of Electrical Engineering Tsinghua University;Electric Power Research Institute of State Grid Fujian Electric Power Company;China Electric Power Research Institute Cooperation;
  • 关键词:电力系统 ; 运行可靠性 ; 证据理论 ; 供电路径
  • 英文关键词:Power system;;operational reliability;;evidence theory;;supply path
  • 中文刊名:DGJS
  • 英文刊名:Transactions of China Electrotechnical Society
  • 机构:电力系统及发电设备控制和仿真国家重点实验室(清华大学电机系);国网福建省电力有限公司电力科学研究院;中国电力科学研究院有限公司;
  • 出版日期:2019-04-09 08:46
  • 出版单位:电工技术学报
  • 年:2019
  • 期:v.34
  • 基金:国家重点研发计划资助项目(2017YFB0903300)
  • 语种:中文;
  • 页:DGJS201914015
  • 页数:8
  • CN:14
  • ISSN:11-2188/TM
  • 分类号:154-161
摘要
对于电力系统中的重要用户,往往存在多条供电路径,以保证用户供电的可靠性水平。供电路径的可靠性受多种因素影响,如何在实时运行环境中评估不同供电路径的可靠性水平,并选择高可靠性供电路径是本文的研究重点。本文提出了改进的证据理论,考虑不同停运因素间的相关性,建立基于实测信息的合成多种停运因素的元件停运率模型,综合主观判断及客观数据支持对不同停运因素进行合成。在此基础之上,评估不同供电路径的实时可靠性水平,搜索高可靠性供电路径,以保证用户供电质量。算例分析表明,合成后的元件停运率模型可用于量化元件在多种停运因素共同作用下的停运率,在电力系统短期评估中定量分析电气元件及输电线路的实时可靠性水平,为提高重要用户的供电质量提供决策依据。
        For an important customer in the power system, there are more than one electricity supply path to maintain the supply reliability of the customer. Therefore, it is necessary to evaluate the real-time reliability of different supply paths considering various outage factors and locate the most reliable supply path. This paper proposes an improved evidence theory and presents a method to acquire the outage rate of electrical equipment considering various outage factors. The correlations between the various outage factors and critical outage factor are analyzed, and then an integrated outage rate model is established considering the subjective judgement and objective data based on the improved evidence theory. Subsequently, a method to find out the most reliable supply path is put forward. This outage rate model can be used to discover the potential outage components in the current operating condition, and also can be further used to search the higher reliability supply path for customers.
引文
[1]孙元章,程林,刘海涛.基于实时运行状态的电力系统运行可靠性评估[J].电网技术,2005,29(15):6-12.Sun Yuanzhang,Cheng Lin,Liu Haitao.Power system operating reliability evaluation based on realtime operating state[J].Power System Technology,2005,29(15):6-12.
    [2]孙元章,程林,刘海涛,等.电力系统运行可靠性评估理论与方法.大型互联电网运行可靠性基础研究(I)[M].北京:清华大学出版社,2008.
    [3]孙元章,程林,何剑.电力系统运行可靠性理论[M].北京:清华大学出版社,2012.
    [4]郭永基.电力系统可靠性分析[M].北京:清华大学出版社,2003.
    [5]He Jian,Cheng Lin,Sun Yuanzhang.Transformer real-time reliability model based on operating conditions[J].Journal of Zhejiang University:Science A,2007,8(3):378-383.
    [6]王有元,袁园,李剑,等.变压器油纸绝缘可靠性的威布尔混合评估模型[J].高电压技术,2010,36(4):28-34.Wang Youyuan,Yuan Yuan,Li Jian,et al.Weibull mixed evaluation model for reliability of oil-paper insulation in transformer[J].High Voltage Engineering,2010,36(4):28-34.
    [7]刘海涛,程林,孙元章,等.基于实时运行条件的元件停运因素分析与停运率建模[J].电力系统自动化,2007,31(7):6-11.Liu Haitao,Cheng Lin,Sun Yuanzhang,et al.Outage factors analysis and outage rate model of components based on operating conditions[J].Automation of Electric Power Systems,2007,31(7):6-11.
    [8]Bhuiyan M R,Allan R N.Inclusion of weather effects in composite system reliability evaluation using sequential simulation[J].IEE Proceedings-Generation Transmission Distribution,1994,141(6):575-584.
    [9]Alvehag K,S?de L.A stochastic weather dependent reliability model for distribution systems[J]Proceeding of the 10th International Conference on Probabilistic Methods Applied to Power Systems(PMAPS),Rincon,Puerto Rico,2008:243-250.
    [10]周远翔,鲁斌,李震宇,等.蒙特卡罗法计算线路雷击跳闸率随机过程研究[J].高电压技术,2007,33(5):1-5.Zhou Yuanxiang,Lu Bin,Li Zhenyu,et al.Selection of random processes in application of Monte Carlo method to calculation of the lightning flash-over rate of transmission lines[J].High Voltage Engineering,2007,33(5):1-5.
    [11]赵芝,石季英,袁启海,等.输电线路的雷击跳闸概率预测计算新方法[J].电力系统自动化,2015,39(3):51-58,139.Zhao Zhi,Shi Jiying,Yuan Qihai,et al.A new prediction calculation method of transmission lines lightning trip probability[J].Automation of Electric Power Systems,2015,39(3):51-58,139.
    [12]Brostr?m E,S?der L.Modelling of ice storms for power transmission reliability calculations[C]//15th Power Systems Computation Conference PSCC 2005,Liege,Belgium,2005:1-8.
    [13]陆佳政,张红先,彭继文,等.基于皮尔逊III型概率分布的湖南电网覆冰重现期计算[J].电工技术学报,2013,28(1):80-86.Lu Jiazheng,Zhang Hongxian,Peng Jiwen,et al.Calculation of hunan power grid icing recurrence interval based on pearsonⅢtype probability distribution[J].Transactions of China Electrotechnical Society,2013,28(1):80-86.
    [14]段杰,王秀丽,侯雨伸.基于模糊专家系统的输电线路分段冰风荷载等效停运率模型[J].电工技术学报,2016,31(8):220-228.Duan Jie,Wang Xiuli,Hou Yushen.Piecewise equivalent model of ice disaster impact on outage rate of transmission lines using fuzzy expert system[J].Transactions of China Electrotechnical Society,2016,31(8):220-228.
    [15]薛禹胜,谢云云,文福拴,等.关于电力系统相继故障研究的评述[J].电力系统自动化,2013,37(19):1-9.Xue Yusheng,Xie Yunyun,Wen Fushuan,et al.Areview on cascading failures in power systems[J].Automation of Electric Power Systems,2013,37(19):1-9.
    [16]Sun Yuanzhang,Wang Peng,Cheng Lin,et al.Operational reliability assessment of power systems considering condition-dependent failure rate[J].IETGeneration Transmission&Distribution,2010,4(1):60-71.
    [17]何剑,程林,孙元章,等.条件相依的输变电设备短期可靠性模型[J].中国电机工程学报,2009,29(7):39-46.He Jian,Cheng Lin,Sun Yuanzhang,et al.Condition dependent short-term reliability models of transmission equipment[J].Proceedings of the CSEE,2009,29(7):39-46.
    [18]Yu Xingbin,Singh C.A practical approach for integrated power system vulnerability analysis with protection failures[J].IEEE Transactions on Power Systems,2004,19(4):1811-1820.
    [19]王英英,罗毅,涂光瑜,等.电力系统连锁故障的关联模型[J].电工技术学报,2012,27(2):204-209.Wang Yingying,Luo Yi,Tu Guanyu,et al.Correlation model of cascading failures in power system[J].Transactions of China Electrotechnical Society,27(2):204-209.
    [20]中国电力企业联合会.GB 50545-2010 110kV-750kV架空输电线路设计规范[S].北京:中国计划出版社,2010.
    [21]中华人民共和国电力工业部.DL/T 620-1997交流电气装置的过电压保护和绝缘配合[S].北京:中国电力出版社,1997.
    [22]倪明,单渊达.证据理论及其应用[J].电力系统自动化,1996,20(3):76-80.Ni Ming,Shan Yuanda.Evidence theory and application[J].Automation of Electric Power Systems,1996,20(3):76-80.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700