上向水平分层进路充填采矿法在杜达铅锌矿的应用
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Application of Upward Horizontal Sublevel Approach Filling Mining Method in Duda Pb-Zn Mine
  • 作者:焦志慧 ; 闫广亮
  • 英文作者:Jiao Zhihui;Yan Guangliang;China Huaye Group Company Limited;Key Laboratory of Ministry of Education on Safe Mining of Deep Metal Mines;
  • 关键词:倾斜中厚矿体 ; 上向水平分层进路充填采矿 ; 生产能力 ; 损失率 ; 贫化率
  • 英文关键词:Inclined medium thickness broken orebody;;Upward horizontal sublevel approach filling mining wethod;;Production capacity;;Loss rate;;Dilution rate
  • 中文刊名:现代矿业
  • 英文刊名:Modern Mining
  • 机构:中国华冶科工集团有限公司;深部金属矿山安全开采教育部重点实验室;
  • 出版日期:2019-02-25
  • 出版单位:现代矿业
  • 年:2019
  • 期:02
  • 语种:中文;
  • 页:88-91
  • 页数:4
  • CN:34-1308/TD
  • ISSN:1674-6082
  • 分类号:TD853.34;TD862
摘要
杜达铅锌矿100 m中段矿体构造发育,厚度较大。为确保矿山安全高效回采作业,同时降低采矿贫化率和损失率,提高资源回收率,提出了上向水平分层进路充填采矿法。沿矿体走向划分盘区,盘区内自矿体下盘向上盘每隔4~6 m划分一个采场,采用间隔式进路回采结束后进行接顶充填,充填体养护后进行下一循环的回采工作。上向水平分层进路充填采矿法在杜达铅锌矿100 m中段成功应用,以进路为回采单元,缩小了采场暴露面积,控制了顶板,保证了作业人员和设备的安全,并且提高了采场生产能力,将损失率与贫化率降低到10%以内,提高了资源回收率,矿山经济效益显著提高。实践表明,上向水平分层进路充填采矿法是开采倾斜中厚破碎矿体的一种有效方法。
        Orebody structure with large thickness is developed in 100 m middle section of Duda Pb-Zn Mine. In order to ensure safety and efficiency of mining operation, reduce mining dilution rate and loss rate,and improve resource recovery rate, the upward horizontal sublevel approach filling mining method is proposed. The panel is divided along the orebody strikes, the mining area is divided into a stope from the lower wall to the upper wall at 4~6 m intervals, interval approach stoping method is adopted, roof-contacted filling is done after stoping, after the backfilling body is cured, the next cycle of mining operation is carried out. The upward horizontal sublevel approach filling method is applied successfully in 100 m middle section of Duda Pb-Zn Mine, the exposed area of stope is reduced by taking the inlet as the stope unit, the roof is controlled effectively, the safety of personnel and equipment is ensured, besides that, the production capacity of stope is improved, the dilution rate and loss rate is decreased to less than 10%,the resource recovery rate and economic benefits are both improved significantly. The practice results further show that upward horizontal sublevel approach filling mining method is the effective one for the mining operation of inclined medium thickness broken orebody.
引文
[1] 佟磊,肖益盖,何伟,等.盘区上向分层进路阶梯式回采充填采矿方法应用研究[J].有色金属:矿山部分,2018,70(5):43-46.
    [2] 王莉,梁新民,谢经鹏,等.上向进路充填采矿法在极软破水下矿体开采中的应用[J].有色金属:矿山部分,2015,67(5):10-13.
    [3] 李辉,张晋军,施发伍,等.上向水平进路分层膏体充填采矿法在谦比希铜矿的应用[J].现代矿业,2016,32(10):1-3,10.
    [4] 贾旭峰,赵龙,任绍勇,等.上向水平分层充填采矿法回采技术改进及应用[J].黄金,2018,39(9):30-34.
    [5] 严辉.上向水平分层进路充填采矿法在响溪金矿的应用与改进[J].湖南有色金属,2017,33(6):5-8.