According to the engineering geological characteristics of construction site in Quanzhou railway station, the author analyzed the bad geological phenomenon in the construction site, which mainly has fractured zone, the ancient gullies, high slope, seismic liquefaction of saturated sandy soil and groundwate, etc. For the stable distribution of uneven foundation in the construction field, the author put forward treatment measures for the bad geological engineering, so better results have been obtained.