Discussion on Long Spiral Mixing Waterproof Curtain Interlocking Pile and the Construction Practice
详细信息   
摘要
 The paper introduces the construction process of long spiral mixing waterproof curtain interlocking pile, which breaks the construction limitation of original mixing pile and curtain of rotary jet grouting in hard soil areas with lower construction cost, and especially has advantage for the curtain in shallow excavation. Based on the engineering case of the excavation for an underground garage in Beijing, the curtain construction was proved to be an appropriate technology.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700