Diaphragm Treatment in Zheshantou Dam Abutment of Nanjing City
详细信息   
摘要
///Integrated geophysical technology and incorporate geophysical drilling were used to detect the abutment of Zheshantou Dam.And then leakage channels were difined on both site of the dam.So concrete diaphragm thin wall and curtain grouting methods were used to solve the leakage of dam abutment.After the test of high water level,the seepage from dam leakage,reduced significantly.And the danger of reservoir were solved. 

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700