Based on an underground continuous wall construction project in Wuhan, this paper discusses difficulties caused by three-axis mixing pile construction in the uhra-deep rock-socketed underground continuous wall and in the joint pipe in- stallation and drawing with corresponding solution measures. The practice proves that these measures are effective and can be reference for similar engineering in wuhan.