Comprehensive Treatment Technology of Roadbed of Large Sandstone Pit Backfill in Beijing
详细信息   
摘要
According to the geological conditions of the large sandstone pit and the peripheral conditions, the application of vibor-replacement stone column, dynamic replacement and dynamic composite foundation treatment and heavy compacted crushing stone pile in Shangzhuangdonglu backfill roadbed of sandstone pit was introduced. At high water level, for the sandstone pit back-filled with soft soil and construction waste, vibro-replacement stone column was taken as the seepage tunnel. For the backfill roadbed at both sides of bridge pile, the scheme of heavy compacted crushing stone pile was used in order to reduce the impact to bridge pile.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700