Technique of Multiple Removals under High Impedance Layers Based on Forward Modeling
详细信息   
摘要

With the improvement of the exploration degree, exploration target of old oil fields towards the deep and shallow is one of the development directions in East China. Dolomite deposition of lateral stable spread not only shields the effective downwards propagation of the seismic signal, but also generates multiples in Biyang deep area. The paper puts forwards a correlative processing method to improve the processing technology of the deep seismic reflecting quality at high impedance of dolomite in deep depression. Multiple removal and energy compensation by deletion fitting method are used in Biyang deep depression, which improves the SNR and resolution of the deep seismic processing data and gets a good exploration effect.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700